From first eggs to full-scale production
When the first eggs arrived in January 2024, the project entered a new and defining phase. From that moment, progress was no longer driven solely by construction milestones, but by the development of a living production cycle — where the growth of the fish dictated the pace and sequencing of the work.
In practice, this meant the facility was built and brought into operation step by step, while production was already underway. Construction, commissioning and operations ran in parallel, requiring close coordination and continuous alignment across disciplines.
The facility integrates the full production lifecycle, from hatchery and smolt to grow-out and finally, pre-processing. Delivering this required ensuring that each department was completed, tested and operational at exactly the right time — ready to receive fish as they progressed through the system.
First harvest
In June 2025, the project reached a major milestone with the harvest of the first production batch, marking the transition from completed delivery to proven performance.
At this stage, the facility demonstrated stable production conditions, with harvest weights of 3.5–5 kg (HOG) and premium product quality. This proof of concept confirms that the facility not only meets design specifications, but performs as intended under real production conditions.